All PP8A Guard-house Licenses & Permit Have Been Renewed

The Temporary Occupation License  (TOL) issued by land office and Building Permit issued by Majlis Perbandaran Sepang for PP8A guard-house under our approved Gated & Guarded Community Scheme have been renewed for year 2014.

20131215_111900

Police investigation on fence break in incident

The renewal is necessarily to ensure that our G&G scheme is fully legalized and in continuity for the perpetual peace and security of our community. However there are still some people who are trying hard to destroy our perimeter fencing and undermine our security establishment.

According to Petaling Jaya City Council (MBPJ) public relations officer Zainun Zakaria, only 18 residents associations (RAs) of the 181 or less than 10% have applied to erect guard booths.

“It’s estimated that only 15 out of 146 gated communities in Klang comply with current state laws to regulate them.The majority have been set up illegally.” said MPK councillor Lim Lip Suan.

“If the structures are built without permission from the local government, they are considered illegal and can be asked to remove.” Teng Chang Khim state executive councillor in charge of local governments.

Who & Why created the messy conjoined twins of 8A & 8B?

The Developer and Majlis had created a big dilemma to 445 purchasers or residents of Phase 8A (197 units) & Phase 8B (248 units). The Majlis wanted to open up the divider fencing between the 2 phases but failed to address the issue of connecting roads (cul-de-sac), security control  over the perforation of perimeter fencing and the legality of 8b guardhouse of the two separated G&G schemes.

It is like a conjoined twins or commonly named as Siamese twins. It is difficult to be surgically resolved. Most cases of separation are extremely risky and life-threatening. In many cases, the surgery results in the death of one or both of the twins. Even the surgery is successful they  do not live to their normal life expectancy or premature death.

Similarly, it is cautious that, any harsh action imposed by the authority without due consideration and consultation with the JPP, RA and all the residents is likely detrimental to the effort of promoting long lasting security, peace, stability and good neighbourhood or harmonious living environment to the region.

Siamese-twins-7_blog-fulltwin 2

Please see below, from the old master plan, it is clear that 8A & 8B were in fact planned as 1 phase with 1 exit, 1 garden or playground in the middle. But some way along the development (gestation), the embryo splits into two,  or became Siamese twins with 2 exits (2 mouths) , 2 RAs (2 heads), 2 bodies (2 phases), 1 playground ( sharing 1 lung and 1 heart)…..

Now, the developer (mother) and the authority (surgeon) blames the twin babies why can’t you all just live a happy life and be quiet instead keep crying every day & night…………

The then GM Mr Ivan Hor says  “extra” features provided at no additional cost are what differentiate Taman Putra Prima from other developments. Each phase for instance, will be fenced up, with his own guarded access and this is for free. (TheEDGE 17 December 2001)

A value proposition for investors and homebuyers alike, Taman Putra Prima’s newly launched Phase 8A offers 197 units of freehold double storey terrace houses built on 22’ x 65’ lots served with a fully equipped playground of its own.

(Source: i-property Thursday, September 17, 2009)

http://epuchong.blogspot.com/2009/09/taman-putra-prima.html

Petitition for Ragut

KEMPEN MENANDATANGAN MEMORANDUM “HUKUMAN ROTAN DAN PENJARA MANDATORI UNTUK PERAGUT”
Caught in the act: The snatch thief attempting to grab Dai’s handbag at Love Lane in Penang. (Right) The suspect being kept under close watch.

Caught in the act: The snatch thief attempting to grab Dai’s handbag at Love Lane in Penang. (Right) The suspect being kept under close watch.

Fight Crime_Snatch Theft

Signature campaign for mandatory whipping and minimum 1 year jail sentence for ragut offences.
Thank you very much for signing! We must collect 500,000 to get signatures for ROTAN & JAIL for mat raguts.
Thank You.

There are too many cases of ragut (snatch thieves) and people getting BADLY hurt or EVEN DIE.

ROTAN & JAIL for Raguts signature campaign is about seeking mandatory rotan & jail for snatch thieves (peragut).

TAKE back the streets for yourself and your loved ones so that no-one need to fear again.

PLEASE get all your friends to come in here to sign the petition.

Thank You.

Kuan Chee Heng

AJK JPP Zon Taman Mas / Putra Prima Received Certificate of Appreciation From YDP MPSepang

7/12/2013 RA Reporting

1483845_10152059136798695_1907429627_o

AJK JPP Zon Tmn Mas/Putra Prima with YDP Tuan Sayuthi, Exco YB Dato’ Teng Chang Khim, Ahli Majlis Mr Pulanthran

Four key committee members of the Gabungan Persatuan Penduduk Taman Putra Prima were among the recipients of the Certificate of Appreciation for being the committee members of Community Consultative Committee (AJK JPP) of Taman Mas/Putra Prima  Zone for  year 2013 session . The certificates were presented by the YDP of MPSepang Tuan Sayuthi Bin Bakar and the occasion also officiated by YB Exco Dato’ Teng Chang Khim.

The ceremony took place in Palm Garden Hotel, IOI Resort Putrajaya this afternoon. All 24 Zones AJK JPP of Sepang district were invited to attend the certificates of appreciation receiving ceremony and high tea was served at the end of the function.

8A RA Chairman cum Gabungan President Mr Kong Kok Meng was appointed by Majlis Perbandaran Sepang as Deputy Chairman of JPP Zon Taman Mas-Putra Prima, While Gabungan Vice President Mr Steve Jong, Gabungan Secretary Mr Terence Choong, and Gabungan Committee Member Mr Chua Choon Hwa were appointed as AJK JPP Zon – Taman Mas /Putra Prima

Roles and Objectives of JPP

  • To strengthen and optimise the responsibilities of the Council Members (Ahli majlis) as agents of communication between the Council and the residents of Sepang.
  • To act as an agent of dissemination for Council’s information and rules to the residents.
  • To promote residents’ involvement in all Council activities.
  • To monitor all resident association activities in all zones.
  • To conduct LOCAL AGENDA 21-related activities and promote a sustainable development within MPSepang.
YDP, Exco, Adun

VIP table :YDP Tuan Sayuthi, Exco YB Dato’ Teng Chang Khim, Adun Sg Pelek YB Lai Nyuk Lan, Ahli Majlis Mr Santokh Singh

Fenced up, Guarded Access & many facilities were promised way back over a decade ago by the developer

3/12/2013 RA Reporting

Coincidentally, over a decade old article which appeared in THE EDGE published on December 17, 2001 explicitly touching on the controversial subject of fenced up and guarded access to each phase of Taman Putra Prima was brought to the attention of the RA/Gabungan.

The then GM Mr Ivan Hor says  “extra” features provided at no additional cost are what differentiate Taman Putra Prima from other developments. Each phase for instance, will be fenced up, with his own guarded access and this is for free.

“When people  buy these homes, they don’t expect it to come with a security feature. But here, this is exactly what we are giving them, We didn’t even advertise this in our sales brochure,” Hor reveals.

The developer also plans to build wading pools and cabanas to facilitate community building. The plan for these have been submitted to the local authorities, and Hor says approval has been given in principle.

Foot and bicycle path will be linked, enabling residents to walk or cycle within the township. There are also plans to incorporate cul-de-sacs to reduce the free flow of traffic and speeding within the housing area.

below is the scanned copy of the original article from THE EDGE

color a3-page1 (3)

警区主任吁民众参与志愿警拼治安

光明日报 2/12/2013 蒲种讯

Sepang Acting  OCPD or District Police Chief, DSP Zaldino Zaludin

Direct Line: 013 292 4226 (prefer sms)

 

Alamat Telefon Faksimil
 Ibu Pejabat Polis Daerah (IPD) Sepang Polis Diraja Malaysia 43900 Sepang, Selangor  03-8706 2222  03-8706748

 http://www.spdrmselangor.org.my/index.php?option=com_content&task=view&id=23&Itemid=1

Ronda Polis

8A RA presented a brand new 1.5HP York aircon to Tmn Putra Prima police station

20/11/2013 RA reporting

IMG_2079

Chairman Kong presenting the aircon remote controller to ketua balai S/Insp Aziz and accompanied by Gabungan Secretary Terence Choong

The security conscious and peace loving PP8A residents welcome the newly shifted in police squad from Putra Perdana to Taman Putra Prima. Before, our Taman Putra Prima pondok polis used to be served as a stop over or rest area stationed by  only one or two police constables.  Now it is a full function police station (balai) equipped with operation rooms, 24 hour service counter  and is headed by a ketua balai S/Insp Aziz bin Ali.

Coincidentally, the police station is just located several hundred meters away from the guard house or main entrance of our  gated and guarded community scheme. It is indeed our nearest neighbour and the most strategic security supporting counterpart.

As a gesture of appreciation to the squad dedication and commitment to battle against crime in our Taman, we the RA is most delighted to contribute a 1.5HP brand new York aircon unit to the renovating police station.

Let’s join effort with the police and contribute our part to turn TPP8A into the safest place or home for all.

Phase 8A infrastructural works and street lightings handed over to MPSepang

19/11/2013 RA Reporting

The maintenance of all Phase 8A infrastructural works including, road, drainage and public/street lightings were handed over to MPSepang  from developer effectively from 1st October 2013

Nevertheless, the scope of taking over work is excluding of perimeter fencing and guard-house which shall remain solely under the care and maintenance of the resident association.

Lowering Of Water Retention Basin Level & Desilting Works To Ease Off Road Flooding

(15/11/2013 Taman Putra Prima reporting)

This slideshow requires JavaScript.

The western end of the newly repaired Jalan Putra Prima Utara is still flooding after heavy down pour. This persistent problem was brought to the direct attention of the Jabatan Kejuruteraan MPSepang by the 8A resident association several months ago.

Among the immediate measures taken by the Jabatan Kejuruteraan including building more scupper drains and weep holes along the flood prone area, two  new box culverts were laid across Jalan  Taman Mas to alleviate the discharge capacity by diverting substantial amount of the storm water to Taman Mas instead of flowing to the over loaded Tmn Putra Prima storm retention basin.

However due to new developments added to the upper stream, plus clogging of water canal at the downstream, Engineer from the Jabatan Kejuruterran of MPSepang En Mohd Hairil Ridza Bin Hashim and Pengarah Puan Nurulbaiti Binti Zainuldin had several discussions and follow up site inspections with the Vice Chairman of the Residents’ Consultative Committee of Zone Putra Prima & Taman Mas (Jawatan-kuasa Perunding Penduduk) or (JPP) Mr Kong Kok Meng.

A quick decision was made yesterday  to deploy a tractor mounted jackhammer to reduce the design level of the spillway structure or ponding level of the existing water retention basin, and to prescribe desilting work at the down stream in order to ease off the slow discharge of storm water.

Hopefully with these rapid remedial actions by the Jabatan Kejuruteraan, the discharge of the excessive storm water that causes frequent flooding to our road is under controlled.  The RA  also like to express gratitude to the officers of Jabatan Kejuruteraan for their dedication.

八打灵再也‧居协与市政厅大斗法‧围篱社区你拆我再围

(雪兰莪‧八打灵再也6日讯

“你拆,我再放”!

1463195_353112654835112_1515795453_n

围篱社区计划在雪隆许多住宅区乃见怪不怪。为了保卫家园不少居协组织都在住宅区设立围栏並聘请保安驻守。

然而,灵市政厅早前就以违反社区围篱指南为由,大阵仗出动执法人员拆除灵市一些住宅区的围篱。

受影响地区的居协组织与八打灵再也市政厅更因此上演“大斗法”,执法人员在拆除栏杆和移除油桶后,居协就在他们拉队离开的当天,重新装上新的栏杆和新的油桶,犹如在玩“捉迷藏”!

遭灵市政厅拆除围栏的地区包括阿拉白沙罗PJU1A/43路与PJU1A/43E路、万达镇BU6/6与BU7/1路、万达镇BU6/2与BU7/1路及SS22/2路。执法人员拆除不符合指南规定的铁柵和移走油桶等。

更知详情,请按以下连接

http://mykampung.sinchew.com.my/node/256301?tid=6