Monthly Archives: December 2014

A new demarcation to our G&G perimeter fencing

A new demarcation of our G&G perimeter fencing proposed by the Majlis has finally been put up by the developer to mark an end to the controversial playground between phase 8A and 8B.

With the erection of the new fencing, all non residents or visitors who wish to enter our G&G compound are required to register at the main entrance guard house and to observe our security Standard Operating Procedure (SOP).

G&G plan - Copy

Majlis proposal with 2 options, Option(1)–merger between 2 phases or Option (2) separated with 2 sides fencing to the playground.

IMG_2223 - Copy

A meeting was held in majlis on 5/3/2014 chaired by Pengarah Perancangan Cik Rozeta, attended by Ahli Majlis Mr Pulanthran, Developer, 8A & 8B RA representatives to resolve the controversial playground and fencing issues.

 

DSCN3305

New fencing being erected along Jalan PP2/9

DSCN3304

Both 8A and 8B are totally separated by the playground in between the 2 phases with their own perimeter fencing.

Please read copy of the directives from the Majlis below:

Pilihan Dua (2)

Persatuan Penduduk Taman Putra Putra Prima Fasa 8A dan Persatuan Penduduk Taman Putra Prima Fasa 8B membentuk Skim Komuniti Berpagar dan Berpengawal secara berasingan ;

Satu (1) Pagar baru yang mengadang kawasan lapang akan di bina di sepanjang Jalan PP2/9 (Fasa 8A) oleh pihak Pemaju dan pihak Persatuan Penduduk Taman Putra Prima Fasa 8A dan Fasa 8B boleh menggunakan kawasan lapang tersebut mengikut waktu yang ditetapkan oleh Persatuan masing-masing

 Full text in PDF file below

Notis Maklum Balas.PDF 1-4-2014

PDF – CUSTOM_1.PDF 28-8-2014