Daily Archives: 06/09/2013

Reccurence of newly patched up sinkhole at Jalan Putra Prima Tengah

AWAS! CAUTION!

IMG_1932

My worker is putting branches to the sinkhole to alert motorist

IMG_1940

The sinkhole is getting bigger and deeper after 4 days from the above picture taken

Motorists commuting the Jalan Putra Prima Tengah between Taman Mas, Taman Putra Prima Phase 3B, 2B, 1A-1B and new development 6A please beware that recurrence of old sinkhole is found next to manhole MH2.

For your information this sinkhole was developed some time in March this year, After my tip off to the Majlis, it was kind of filled up and patched up. However in less than half a year the sinkhole recurring again. For the safety of my fellow residents, I had instructed my worker to put up some branches to alert motorists while reporting the incident to the Jabatan Kejuruteraan MPSepang immediately via whatsApp photo upload.

See more on previous post on the same spot/ happening at Gabungan blogspot

http://gabungantpp.wordpress.com/2013/03/23/more-sinkholes-in-taman-putra-prima/

IMG_1934

Poor infrastructure is likely to affect the demand of any new development and the quality of living to the existing schemes.

For long term solution only seems by relining of fauty sewer line.

For long-term solution, apparently only by re-lining of faulty sewer line beneath, many cases showed that by simply patching up the sink-hole will not last for 6 months.

IMG_1933

The traffic load is likely to be heavier, when more new schemes and 2 schools are added along the sinkhole prone road.

https://tpp8a.com/2013/02/05/our-taman-sewerage-was-attended-by-the-most-advanced-technology-from-the-renowed-australian-rib-loc-co/

http://www.sekisui-spr.com/products/spr-pe.aspx