Image

Another road depression discovered next to manhole not far from PP8A main entrance. Our Guard Marzuki fell from his motor at that spot


Guard Marzuki replay the scence where he felt from his motor when crossing over the depression last night

Guard Marzuki replay the scene where he felt from his motor when crossing over the depression last night

The deep of depression is about 75mm as measured by road contractor Aziz Ahmad

The depth of the depression is about 75mm as measured by road contractor Aziz Ahmad

10 responses to “Another road depression discovered next to manhole not far from PP8A main entrance. Our Guard Marzuki fell from his motor at that spot

  1. The developer had built and wash hand now, they put our life in the risk. Luckily the new road not yet open for traffic yet, else heavy vehicle sure using the road and may be will be another victim.

  2. The hole has grew bigger today and the whole hole has collapsed, my god, is this gonna happen the same with road just completed like last time? Another 3 years to repair it???

  3. Oh my God just fixed the road, come another hole. Will the developer ever responsible for their poor workmanship? Majlis is repairing it means the rakyat money is being used. Nowadays there are so many developers building poor quality homes/road yet never get punished.

    • We need more residents like Robert to voice out your concern, and to help when you see something not right, also to participate constructively and turn our forum more lively.

    • Kong Kok Meng 江国民 (PP8A RA Chairman)

      We are planning to hold a function for the reopening of the road after closing for 3 years. YB Teresa accepted my invitation to come sometime after CNY , We had invited the developer to join us in organising the event, but Plenitude top management is not responding……

  4. Will the damage be included in the 2.7mil project?

  5. Kong Kok Meng 江国民 (PP8A RA Chairman)

    According to the Penagarah Kejuteraan MPSepang En Zulkefli Bin Mohamed Arif, IWK (Indah Water Konsortium) is going to revamp the entire sewerage line including sending robot and probe into sewer pipes to desilt and to patch up leakage and broken piping, also to reconnect dislodged piping.

    • Let hope there will be a more permanent solution from IWK rather than temporary road patching up. Hope the repair work will not inconvinience too much on the residents.

  6. With this I start to worry about the structure beneath the only road leading to our Home. Will it be last or just an iceberg of bigger one?

    • Kong Kok Meng 江国民 (PP8A RA Chairman)

      The only long term solution is the RA has to work very closely with the Majlis…to go after the problems persistently

leave a reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s