4/10/2021
Following numerous complaints of flooding by Taman Putra Prima and Taman Mas residents, TPP8A RA brought the matter with a proposal to meet the Pengarah Kejuruteraan MPSepang En Ahmad Saifunazif in a townhall meeting held on 9/11/2018. We proposed to have an alternative water channel serves to drain off excessive water from the existing water retention basin. We were grateful that our proposal was indeed well received by the Majlis .
Subsequently construction work commenced on 7/9/2020 and is now completed. Hopefully with this new alternative water channel in place, there won’t be any more flash flood incident at the western end junction of Jalan Putra Prima Utara in the future.
Nevertheless, We would like to take this opportunity to express our most heartfelt thank and appreciation to the ADUN of Dengkil, YB Tuan Adhif, Ahli Majlis En Syamsol, Ahli Majlis En Mohd Nazri Sohot and MPSepang for taken our flood mitigation proposal and implemented it soon after.
Terima Kasih kepada semua pihak yang telah membantu kami, hakikatnya cadangan sudah jadi realiti.

Keadaan dahulu–Sentiasa banjir apabila hujan lebat 
Bersama Pengarah Kejuteraan MPSepang En Ahmad Saifunazif dan En Hairil 
Program Mesra Bicara Bersama Komuniti pada 9/11/2018 
Kontrator mula bergerak ke tapak pada 7/9/2020 
Longkang alternatif sudah siap dibina 
longkang baru sudah berfungsi 
Sempurna dengan pagar keselamatan 